Solar pumping 40m3/day, 50m HMT
This project is one of those complex projects where the challenge lies in adapting to the location and environmental constraints.
Located in a reserve and classified as a high fire risk area, the use of objects that could produce sparks is prohibited.
Therefore, the entire project had to be adapted and a trial assembly planned off-site.
Since the support was rock, the PSF teams opted for a ballasted structure rather than an anchored solution, which would have imposed very significant financial constraints on the client.
Technical Details
AXITEC Solar Panels
WELLPUMP Pump
NASTEC Pumping Inverter
GSE Ground System Ballasted Structure